Evo Design Interface Design

This forum is shown on the index page along with all topics.

Moderator: robpearc

felix_waldmann
Posts: 1
Joined: Mon Dec 20, 2021 11:09 am

Evo Design Interface Design

Post by felix_waldmann »

Dear Service Team,

I uploaded a protein complex to optimize the binding site of the scaffold structure (https://zhanggroup.org/EvoDesign/output ... 28/hju7j3/).
Current status; Your submission has been received and the job is running. . .
My question: how long does it usualy take until I recive the results?

Its running now 3 days. Should I be concerned, that something is wrong?

Thanks a lot.

Best regards
Felix
robpearc
Posts: 43
Joined: Sun May 02, 2021 5:49 pm

Re: Evo Design Interface Design

Post by robpearc »

We apologize for the delays. We are currently working on repairing the server and hope to return your results asap!
Post Reply